     The purpose of the 火 Hydrant Meter Permit Program is to help the City track the amount of water used during construction. Prior to construction, contractors must obtain a hydrant meter permit. All fees and deposits under the fire hydrant permit shall be paid prior to permit issuance.

     To make this process as easy and quick as possible we ask that you fill out a 火 Hydrant Meter Application.  Once filled out this form can be emailed to pwoffice@psychomotricite-la-seyne.com, faxed to (916) 371-1516, or brought in or mailed to 1951 South River Rd. 

The following are some frequently asked questions:

Where do I apply for a 火 Hydrant Meter Permit?

We are located at 1951 South River Road. Our hours are 7:00am to 3:30pm.

Is there anything else needed besides a hydrant meter for construction purposes?

这取决于.  A backflow device is always needed whenever water is being used/metered directly from a fire hydrant and not being used to fill a permitted water truck/tank. The backflow device is provided as part of the rental.    

How can I pay my deposit?

Your deposit can be paid by check or cash at 1951 South River Road.  If you wish to pay using a credit card* or debit card, you can do so at City Hall once you obtain a quote or completed 火 Hydrant Meter Permit.  Remember, all payments are due prior to picking up the meter.

Will I be required to pay a deposit if I’m working on a City project?

是的. However, you will only be required to pay a refundable deposit. All rental and water use fees will be charged to the project, as long as you can provide a valid work order number which is issued by the engineering division.

 

Please contact us at (916) 617-4850 or turn in a 火 Hydrant Meter Application 获得报价.

 

*All credit card payments are subject to a 3% credit card fee effective July 1, 2018