The West Sacramento Area Flood Control Agency is working quickly and efficiently to face the challenges of stricter flood control standards imposed by the state in 2006 that must be met by 2030. Together with our partners from the Department of Water Resources, 中央河谷防洪委员会和美国.S. 陆军工兵部队, WSAFCA has moved quickly to design and construct projects that meet the 200-year level of flood protection requirement imposed by new state law and new federal levee standards imposed after the Gulf Coast disasters.
The City and WSAFCA have created regulatory and legislative partnerships to leverage local funds with state and federal government contributions. 大多数防洪工程是由伙伴机构资助的.
当前的项目
南港萨克拉门托河早期实施项目
第三阶段:河漫滩修复
The restoration areas are actively being managed and the Agency is discussing preparation for the flood season. There will be an experimental planting area to see if additional mulch and other treatments can improve vegetation growth on the remnant levee.
随着这些植物继续生长以恢复栖息地, please be mindful to avoid stepping on plants and driving recreational vehicles in the Restoration Project area.
约洛绕道东堤工程
设计
The final design package was submitted to the USACE on June 30, 2021.
环境
Following the requirements of the National 环境 Policy Act and the California 环境 Quality Act, a supplemental draft 环境 Assessment/Initial Study (EA/IS) has been prepared and is available for public review and comment at:
The 萨克拉门托河西北堤防工程 (North Levee) is the next portion of the West Sacramento Federal Project planned for design and construction by the USACE.
The Agency is currently soliciting Requests For Proposals for geotechnical, 测量, 环境海洋之神登录入口. rfp可以在procrenow上查看.com
完成项目
南港萨克拉门托河早期实施项目
The last phase of construction for the Southport Levee Improvement Project started at the end of May. This final phase brings material from Elk Grove to restore the parcels where material was sourced to construct the Southport setback levee.
WSAFCA completed the hauling portion for the Borrow Restore Project in the first week of August. 为了减少格雷戈里大道上的卡车, WSAFCA included a line item to slurry seal the roadway after the haul. 在承包商应用泥浆密封之前, WSAFCA与公共工程部合作修复受损的路面, 填补坑洞, 封住一些裂缝. The repairs by 公共工程 prior to the slurry seal made for a better finished product. 现在,维修和泥浆密封完成, 下星期将在这条道路上安装新的横条.
视频:2018年南港大堤
第2期-南港大堤改善工程
领导机构: WSAFCA 项目阶段: 建设完成.
项目细节: WSAFCA has completed construction of the Southport Levee Improvement Project which involves the construction of flood risk-reduction measures along the Sacramento River South Levee in the city of West Sacramento. Levee improvements included a combination of fix in place and a new setback levee embankment construction with cutoff walls, 渗流堤坝, 效用搬迁, 拆迁, 岩质边坡防护, 以及借用网站的使用. 项目交通改善包括重新调整道路, 新建坡道和道路, 战斗服, 死路, 维修走廊. Constructed flood risk-reduction measures addressed deficiencies of through-seepage, under-seepage, 边坡稳定性与几何, 侵蚀, 侵占, 以及不适应的植被. WSAFCA's goal is to achieve a 200-year level minimum of levee performance for the 西萨克拉门托市. The project would bring the levee up to standard with Federal and State levee design criteria, as well as provide opportunities for ecosystem restoration and public recreation.
项目细节: As the first phase of the 南港萨克拉门托河早期实施项目, WSAFCA has completed construction of the Village Parkway South project. Village Parkway South is a three-mile stretch of roadway that will replace segments of South River Road and provide property access to residents before levee construction begins. The Village Parkway South improvements included a 36 foot wide paved roadway with 2 lanes with bicycle lanes along with associated residential access roads, 排水系统的改进, 签名和条带, 水污染控制. The 西萨克拉门托市’s General Plan already identifies the construction of Village Parkway but due to the levee improvements, construction is starting 10 years earlier than previously anticipated.
巷道长度: 3英里及相关道路 工程造价: 5000000美元的估计
萨克拉门托银行项目-南河路
领导机构: U.S. 陆军工程兵团 完成: 2015
项目细节: 石闸南面的后退堤防, 包括防渗墙, 将南河路迁往新堤防.
堤长度: 2200英尺 工程造价: $8,000,000
热电联产学院早期实施项目
领导机构: WSAFCA 完成: 2011
项目细节: Reconstructed the south levee of the Sacramento Bypass to correct seepage and geometry deficiencies, 包括防渗屏障.
堤长度: 6300英尺 工程造价: $10,000,000
河流早期实施项目
领导机构: WSAFCA 完成: 2011
项目细节: Reconstructed the south levee of the Sacramento River north of Bryte Park to correct seepage and geometry deficiencies, 包括防渗屏障.
其他福利: 创建了Bryte公园自然步道, 包括6个,000英尺完全可达, 铺砌的休闲通道
堤长度: 3100英尺 工程造价: $17,000,000
绕行南线工程
打滑修复#2
领导机构: U.S. 陆军工程兵团 完成: 2011
项目细节: Completed slip repairs to a section of the Yolo Bypass Levee North of Interstate 80/Hwy. 沿着Yolo旁路50英里.
堤长度: 2500英尺 工程造价: 3500000美元的估计
打滑修复#1
领导机构: U.S. 陆军工程兵团 完成: 2009
项目细节: Levee repair and reconstruction to the levee along the Yolo Bypass south of Highway 80; included improving adjacent drainage facilities.
其他福利: 开放萨克拉门托河畔供公众使用, created more than a mile of fully accessible recreational pathway and numerous visitor amenities along the waterfront and into the new Bridge District urban core.
堤长度: 3250英尺 工程造价: $3,122,200
一、街桥前期实施项目
领导机构: WSAFCA
完成年份:2008年
项目细节: I街大桥附近的堤防工程纠正了渗水问题, tree removals and shaping of the levee; included removing vegetation as part of the U.S. 陆军工兵部队标准.